What are the precautions for the correct installation of led street lights?

2020-09-18

In the process of installing led street lights, the standardized installation method is to ensure our correct use of the premise, the following small series for you to analyze: led street lights correct installation precautions?


First of all, the installation height of led street lights on the same road (from the light source to the ground), elevation Angle, and the direction of the lamp should be consistent. The excavation size of the foundation pit shall comply with the design regulations, the strength grade of the foundation concrete shall not be lower than C20, and the cable protection pipe in the foundation shall pass through the center of the foundation and exceed the foundation plane by 30-50mm. Water must be removed from the pit before pouring the reinforced concrete foundation. The metal components such as pole, arm, hoop, bolt and pressure plate used in the installation of led street lamps should be hot-dip galvanized, and the anti-corrosion quality should meet the relevant provisions of the current national standards.

LED路灯

The longitudinal center line of the led lamp installation and the longitudinal center line of the lamp arm should be consistent, the horizontal line of the lamp should be parallel to the ground, and there should be no tilt after tightening. The led lamp cap is fixed firmly, the adjustable lamp cap should be adjusted to the correct position according to the design, and the lamp cap wiring should comply with the regulations. There should be no joint in the led street lamp arm, lamp tray, lamp pole threading, threading hole or pipe mouth should be smooth, no burrs, and should be insulated sleeve or bandaging, bandaging length shall not be less than 200mm. All kinds of nuts should be fastened with gaskets and spring pads. After tightening, the nut shall not be less than two pitches.


LED路灯


LED street lamp installation steps and precautions


4. Pour


The embedded parts are placed in the pit and cement is poured. In the process of pouring, attention should be paid to stabilizing the embedded parts to ensure that the embedded parts are straight.


5. Fixed LED street lights


Wait for the foundation to dry, fix the bottom flange of the assembled LED street lamp with the embedded part, and tighten the screws.


Step 6 Connect cables


Connect the wire in the lamppost with the laid cable, wrap the connector with adhesive tape, and prevent the connector from the lamppost.


The above is about the correct installation of led street lamp specifications and installation steps, if there are questions, you are welcome to call for advice, we continue to update more relevant instructions for you, you can pay attention to our website to learn more.